HEAT TREATMENT OF PIPES III

Publish Time: 2022-03-04     Origin: Site

If a weld is allowed to cool prior to the postweld heat treatment, the rate of uniform cooling must be controlled to prevent a detrimental effect in the piping.


Partial heat treatment of a piping assembly that cannot be fitted completely into a furnace is acceptable if there is at least a 300 mm (1 ft) overlap between successive heats and parts of the assembly outside the furnace are protected from harmful temperature gradients.


The local heat treatment of a weld is acceptable if the heat treatment is applied circumferentially on the run pipe and the branch. This section should be heated until the specified temperature exists over the entire pipe section and at least 25 mm (1 in.) beyond the section.



Get exclusive industry advice for free

Seamless vs. Welded Stainless Steel Pipes: Which is the Best Cost-Effective Choice for Your Project?

How To Inspect Steel Pipe Quality on Site? 5 Essential Checklists for Buyers

Essential Guide to Pipe Fittings and Flanges: Ensuring Perfect Compatibility with Your Steel Pipes

Steel Pipe Procurement FAQ: Top 6 Questions Answered | Hebei Metal

Common Steel Pipe End Types and Their Applications: Beveled, Threaded, and Plain Ends